Burbank Locks In a $17.15-per-kVA Commercial Demand Charge for 2027
The City of Burbank’s Adopted Citywide Fee Schedule prices Schedule D, Medium General Service from 20 kVA to 250 kVA, at $16.10 per kVA of billing demand effective January 1, 2026 and $17.15 per kVA effective January 1, 2027. Both numbers sit in the same adopted document, in Article X, printed for the commercial classes Burbank Water and Power serves.
Municipal utilities set rates by council resolution and publish them as fees. The practical consequence is a dated, line-item schedule: a commercial tenant in Burbank can read the January 2027 price of a kilovolt-ampere of billing demand today, two years ahead of the billing cycle it applies to.
The step. Across Schedule D, the demand charge rises 6.5 percent between the two effective dates. The minimum demand charge does not move: it holds at $134.71 a month in both years. The entire increase therefore lands on the per-kVA rate applied to measured billing demand rather than on the floor beneath it.
The larger classes. Schedule XL-TOU Secondary, covering service above 1,000 kVA, moves further than Schedule D. Its distribution demand charge goes from $11.50 to $12.85 per kVA, and its reliability services demand charge from $8.50 to $9.60 per kVA. Combined, the two components rise from $20.00 to $22.45 per kVA, a 12.25 percent step. Schedule L-TOU Secondary sits between the two, with its combined charge rising from $21.00 to $22.10 per kVA.
The vote. Burbank Water and Power’s approved-rates page records an electric system average increase of 9.9 percent effective January 1, 2026 and an identical increase effective January 1, 2027. The Burbank City Council approved both years on May 20, 2025. One vote, in other words, fixed the commercial demand charge for two consecutive billing years, and the second of those years has not yet begun.
What the arithmetic produces
A 200 kVA office on Schedule D, holding consumption and peak demand constant, sees its annual demand bill rise by roughly $2,520 between 2026 and 2027. Nothing about the building changes. No equipment is added, no shift pattern alters, no new load appears on the meter. The per-kVA price of the same peak simply goes up.
Because the minimum demand charge is flat across both years, reductions in measured peak capture the full difference between the two rates rather than running into a rising floor. A customer who trims 50 kVA off a Schedule D peak avoids $805 a month in 2026 and $857.50 a month in 2027: $9,660 and $10,290 respectively on an annual basis. The delta between those two figures, $630, is the pure effect of the rate step on an unchanged load profile.
For the largest customers the effect compounds. At the Schedule XL-TOU Secondary combined rate, each kVA of peak reduction is worth $20.00 a year more in 2026 and $22.45 in 2027 against distribution and reliability components alone, before any energy or time-of-use consideration enters the calculation.
Why the publication format matters
The content of Burbank’s increase is unexceptional. Municipal and investor-owned utilities across California have raised distribution rates on similar trajectories, and a 9.9 percent system average increase is within the range of recent approvals in the state.
The format is the distinguishing feature. Burbank publishes its electric rates as an article of a citywide fee schedule, which means the 2027 values are printed alongside the 2026 values in a single adopted document, with effective dates attached to each line. A building owner evaluating a capital project in the fourth quarter of 2026 can model two full billing years at published rates rather than one published year and one forecast.
That distinction has consequences for how projects are underwritten. Demand-charge escalation is ordinarily an assumption in a financial model, and assumptions carry discount. Where the second-year rate is already adopted and dated, the escalation becomes an input rather than a projection, at least for the span the schedule covers. Beyond January 1, 2027 the question reverts to the usual uncertainty, because the adopted schedule does not extend past that date.
The customer profile
Burbank Water and Power serves a municipal territory in Los Angeles County whose commercial building stock includes studio, office and light-industrial properties. Schedule D’s 20 kVA to 250 kVA band captures a substantial share of that stock: the mid-sized commercial customer whose connected load is large enough to be billed on demand but not large enough for the time-of-use structures applied above 1,000 kVA.
For that band the 2027 step is simple to quantify, which is partly a function of the schedule’s own simplicity. Schedule D prices demand on a single per-kVA figure rather than splitting it into distribution and reliability components as the larger schedules do. The customer sees one number, and that number rises 6.5 percent on a date already fixed.
The limits of the document
Several things the adopted fee schedule does not resolve are worth stating plainly.
It does not indicate whether further increases follow January 1, 2027. The approved-rates page records two years of increases; it does not forecast a third. It does not break down what drives the 9.9 percent figure in each year, and the stated system average is an average across the electric system rather than a guarantee that any individual class moves by that percentage. Schedule D’s 6.5 percent demand step and Schedule XL-TOU Secondary’s 12.25 percent combined step both differ from the system average, in opposite directions.
Nor does the fee schedule speak to how a given class’s customers actually experience the change in total. Demand charges are one component of a commercial bill, and the figures above describe the demand component only. A customer whose consumption or peak shifts between years will see a different result from the constant-load case modeled here.
What the document does establish is the price of billing demand on two dates, for named service classes, in a form a third party can read without a rate case filing or a utility forecast. For capital planning purposes on Burbank’s commercial stock, that is the information most often missing.
Sources
- City of Burbank Adopted Citywide Fee Schedule, Article X: Electric Rates and Charges (City of Burbank)
- Approved Rates 2026-2027 (Burbank Water and Power)